
Add to Cart
Inner tank solar water heater grooving machine solar water heater machinery
QJ-3000 Inner Tank Air-pressure Type All-automatic Grooving Machine (Automatic)
Application: Grooving for inner tank (solar water heater grooving machine)
Description: Solar water heater grooving machine adopts PLC automatic control system, the upper and lower arm get linked and grooves automatically, also stops automatically when finish rolling then upper and lower arm disengage automatically. Solar water heater grooving machine has 12 rolling wheels, use adjustable stroke cylinders, so that can freely adjust the height of roller ribs. Idler wheel is made of No 45 steel material, with clad layer of 0.10mm hard chrome. Electrical components from Omron brand, cylinder from Taiwan AirTAC.
Parameter:
Effective Length | 3000mm |
Wheel Number | 12 unit |
Max. Material Thickness | 0.6mm |
Power | 1.5KW 50HZ |
Voltage | 380V |
Air Pressure | 0.5Mpa—0.8Mpa |
Labor | 1 people |
Max. Efficiency/per 8 hour | 360pcs/per 8 hour |
Weight | 1250kg |
Size (L*W*H mm) | 4400*800*1800 |
Solar water heater production machine
(1) Time of Shipment: Effect shipment will be around 75-90 days after receiving the 30% advance payment.
(2) Terms of payment: TT at sight (pay 30% advance payment by TT before production, the rest 70% must be paid after seeing the copy of BL by TT).
(3)Acceptance Certficate: The machine acceptance test will be made in the sellers factory at the presence of the buyers technicians for the production. Once the quotation standards reached an acceptance certificate will be signed by both parties and the machine shall be considered accepted.
(4) Guarantee Period: In correct operation&maintaing, the machine is guaranteed for one year from the date of BL date. During the guarantee, it is free for spare parts; after the guarantee, you have to buy new parts if the spare parts are broken. All the machines are piovided with whole-life service.
(5)Installation&Training (Optional)
After the machines arrived at destination, the seller will send 1 technician to the buyers factory to install the machines and trainning the workers at the buyer 's written request.
Installation and trainning period: 7 working days.
The buyer needs provide some technicians to assist the work, solve the language problem of the technicians of the seller. Before installation, the buyer should prepare coil sheet and hydraulic oil and the foundation for positioning the machine.
Installation labor charge: 150USD/DAY
In addition the buyer pays seller's technicians travel cost outside china (including roundflight fee), accommodation and foods(at least three-star hotel with air condition), provide transportation from hotel to the work place. necessary communicaton and insurance etc.
The buyer should pay the above fee in advance.